CULVERT REPAIR / REPLACEMENT PROJECT 27
Project ID No. 280688
Description
This project will rehabilitate or replace deficient culverts as necessary at various locations on the State and/or Federal Highway Systems within Region 2.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Fall 2027.
- Construction is expected to begin in Winter 2027/2028.
- Construction is expected to be completed in Summer 2028.
Cost of the Project
The project cost is approximately $3,550,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the MOHAWK VALLEY region and includes the following:
Counties
HERKIMER
ONEIDA
Towns
SANGERFIELD
STARK
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
21th Congressional District (Elise Stefanik)
22th Congressional District (John Mannion)
State Senatorial District(s)
49th Senatorial District (Mark Walczyk)
53th Senatorial District (Joseph A. Griffo)
State Assembly District(s)
118th Assembly District (Robert Smullen)
122th Assembly District (Brian D. Miller)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
207 Genesee Street
Utica, NY 13501
Phone: 315-793-6307
Email: heather.tehan@dot.ny.gov