RT. 20/UNNAMED CREEK (C260033) CULVERT REPLACEMENT PROJECT
Project ID No. 280687
Description
This project will resurface approximately .57 centerline miles of Route 20 in the Town of Bridgewater, Oneida County, to the Otsego County Line, and will rehab or replace the Route 20/Unnamed Creek Culvert, located approximately 430 feet east of the Route 20/Route 8 Intersection.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Fall 2028.
- Construction is expected to begin in Fall 2028.
- Construction is expected to be completed in Winter 2029/2030.
Cost of the Project
The project cost is approximately $2,100,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the MOHAWK VALLEY region and includes the following:
Counties
ONEIDA
Towns
BRIDGEWATER
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
22th Congressional District (John Mannion)
State Senatorial District(s)
53th Senatorial District (Joseph A. Griffo)
State Assembly District(s)
122th Assembly District (Brian D. Miller)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Reports/Documents
Contact Us:
If you have questions about this project, please contact us:
207 Genesee Street
Utica, NY 13501
Phone: 315-793-6307
Email: heather.tehan@dot.ny.gov