Project Details

NEW HARTFORD PM PAVING; RTE 921E & 921T, ONEIDA COUNTY

Project ID No. 280653 , Contract Number D264929

Description

This project is a pavement rehabilitation project within the Town and Village of New Hartford. Project limits are along Genesee Street (NYS Route 921E) from the intersection with NYS Route 12 to the village line, and, along Campion Road, Oxford Road, and Mill Street (NYS Route 921T) from the New Hartford Shopping Center driveway to the connection with NYS Route 8 Southbound. This 1.7-mile pavement rehabilitation project will be completed using a 2 inch micromill with a 2 inch overlay. Traffic signals and pedestrian facilities within the project limits will be improved. Roadside safety elements will be addressed including guiderail, drainage, and signs. The objective of this project is to improve the pavement ride quality and safety of the roadway.

Issue Description:
Consultant is designing the Signal work for this project.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 01/19/2023

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
03/01/2023 09/30/2024 N/A Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$7,985,446 $553,425 $8,538,871 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the MOHAWK VALLEY region and includes the following:

Counties
ONEIDA

Cities
UTICA

Towns
NEW HARTFORD

Villages
NEW HARTFORD

02 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
22th Congressional District (John Mannion)

State Senatorial District(s)
53th Senatorial District (Joseph A. Griffo)

State Assembly District(s)
119th Assembly District (Marianne Buttenschon)
122th Assembly District (Brian D. Miller)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Heather Tehan
207 Genesee Street
Utica, NY 13501
Phone: 315-793-6307
Email: heather.tehan@dot.ny.gov
Provide feedback on this project