ADA IMPROVEMENT PROJECT 17
Project ID No. 280588 , Contract Number D263665
Description
This project has 3 sites located in Oneida County. In the Village of Holland Patent, Town of Trenton, an accessible pedestrian access route will be created along Route 365 by replacing non-compliant ramps and sidewalk. In the Village of Camden, Town of Camden, additional sidewalk ramps will be addressed in the Village to improve accessibility at various street crossings. The Route 921B (Burrstone Road) site, in the City of Utica, will consist of a multi-use trail along the north side of Burrstone Road.
Project Overview
Project Status
- The project has been Completed Project.
- The Bid Opening was on 03/08/2018
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 06/07/2018 | 11/30/2018 | 10/18/2019 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $1,128,194 | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the MOHAWK VALLEY region and includes the following:
Counties
ONEIDA
Cities
UTICA
Towns
CAMDEN
TRENTON
Villages
HOLLAND PATENT
CAMDEN
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
21th Congressional District (Elise Stefanik)
22th Congressional District (John Mannion)
State Senatorial District(s)
53th Senatorial District (Joseph A. Griffo)
State Assembly District(s)
117th Assembly District (Ken Blankenbush)
118th Assembly District (Robert Smullen)
119th Assembly District (Marianne Buttenschon)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
207 Genesee Street
Utica, NY 13501
Phone: 315-793-6307
Email: heather.tehan@dot.ny.gov