Rt 30: LONG LAKE TO FRANKLIN CO LN, HAMILTON CO
Project ID No. 204490 , Contract Number D265465
Description
THIS PROJECT WILL RESURFACE 11.76 MILES ON ROUTE 30 FROM KICKERVILLE ROAD TO FRANKLIN COUNTY LINE, TOWN OF LONG LAKE, HAMILTON COUNTY. THE PROJECT WILL ALSO INCLUDE THE REPLACEMENT OF GUIDERAIL AND SIGNS. THE BRIDGE RAIL AT THE BRIDGE CARRYING NYS ROUTE 30 OVER THE SALMON RIVER WILL BE REPLACED. THE CULVERT RAIL CARRYING NYS ROUTE 30 OVER THE MUD POND OUTLET WILL BE REPLACED.
Issue Description:
Retaining wall and possible 4f at RM 30-2206-1722, MP 72.07 - MP 72.11
Structures estimated 0.180 for rustic rail at Salmon Rv br (BIN 1020460)
Structures estimated 0.130 for rustic rail at Mud Pond Outlet culvert (C220105)
GIS ID 100267061
Pav't Beg MP 73.20
Pav't End MP 83.71
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 03/27/2025
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 05/02/2025 | 12/31/2025 | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $8,057,284 | ($298,916) | $7,758,368 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the MOHAWK VALLEY region and includes the following:
Counties
HAMILTON
Towns
INDIAN LAKE
LONG LAKE
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
21th Congressional District (Elise Stefanik)
State Senatorial District(s)
49th Senatorial District (Mark Walczyk)
State Assembly District(s)
118th Assembly District (Robert Smullen)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
207 Genesee Street
Utica, NY 13501
Phone: 315-793-6307
Email: heather.tehan@dot.ny.gov