Project Details

AMTRAK RAIL/ LIVINGSTON AVE BRIDGE REPLACEMENT

Project ID No. 1SRP01 , Contract Number D900058

Description

Replacement of the Livingston Avenue Railroad Bridge with a new draw bridge that will resemble the existing bridge.  A multi-use path will be constructed connecting the new Albany Skyway to a trail in the City of Rensselaer.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 10/25/2023

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
05/17/2024 06/29/2028 05/30/2028 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$634,760,000 $0 $634,760,000 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the CAPITAL DISTRICT region and includes the following:

Counties
ALBANY

Cities
ALBANY

01 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
20th Congressional District (Paul Tonko)

State Senatorial District(s)
43th Senatorial District (Jacob Ashby)

State Assembly District(s)
108th Assembly District (John T. McDonald III)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

History

FRA -Finding of No Significant Impact (FONSI)

NYSDOT- SEQR Determination of No significant Effect (DONSE)

NYSDOT proposes to replace the Livingston Avenue Railroad Bridge.  The Environmental Assessment is now available for review. 

Public Information Meetings and Hearings were held on May 31, 2022  and June 1, 2022.

To view a recording of the virtual information meeting and hearing click here.

Transcripts are available:

Anticipated Cost of the Project is $550M.

This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No

Community Outreach

Community Outreach

Public Information Meetings and Hearings were held on May 31, 2022 and June 1, 2022 to view the recording of the virtual meeting/hearing click here.

The Public Comment Period Closed on June 15, 2022.

Environmental Determinations by the Federal Railroad Administration and NYSDOT are complete - 12/2022

The Finding of No Significant Impact by the Federal Railroad Administration is available here.

The Determination of No Significant Effect by NYSDOT is available here.

Final Design and Construction

The Design Build Letter of Intent was issued on 12/21/2022.

Make use of the Web site:

The project website is the simplest way for you to stay current, have accurate project information, submit comments, and receive feedback.

Sign up for the Mailing List:

To receive project updates, you are encouraged to sign up for the project mailing list under the Contact Us page. Your contact information will only be used for the project (and will not be sold or given to anyone outside the project team).

Reports/Documents

Federal Railroad Administration Finding of No Signification Impact (FONSI), complete.

NYSDOT Determination of No Significant Effect  (DONSE), complete.

Download the Environmental Assessment for the Livingston Avenue Bridge Project and appendices by clicking on the links below.  Files in Adobe PDF format on this page require the Adobe Reader. You can download the free Adobe Reader from the Adobe website (www.get.adobe.com/reader/)

Chapters and Appendices:

Draft Memorandum of Agreement for Section-106
Appendix A Design Information

Appendix B Environmental Information

Appendix C Right-of-Way Information
Appendix D Navigation Study

An Environmental Assessment is an evaluation of the possible positive or negative effects that a proposed project may have on the human or natural environment. Its framework was set by the National Environmental Policy Act (NEPA). The Federal Railroad Administration is the lead federal agency for the Livingston Avenue Bridge project for NEPA. The New York State Department of Transportation will serve as the lead State agency for the purposes of the New York State Environmental Quality Review Act.

The public can participate in the NEPA process by attending NEPA related hearings or public meetings and by submitting comments directly to the lead agency. The Public Comment Period for the Environmental Assessment closed on June 15, 2022.To learn more about having a voice, see A Citizens Guide to NEPA authored by Council on Environmental Quality Executive Office of the President (December 2007).

Additional Info/Links

Livingston Avenue Bridge Project

The Livingston Avenue Bridge spans the Hudson River connecting the cities of Albany and Rensselaer, New York by rail.  New York State DOT proposes to replace the Livingston Avenue Railroad Bridge, view renderings of the new bridge here. 

As a part of the rail network, this project is located on the Empire Corridor.  The Empire Corridor is one of eleven federally designated High Speed Rail Corridors in the United States.  The corridor accommodates passenger rail service between New York City and Niagara Falls with station stops in Poughkeepsie, Rhinecliff, Hudson, Rensselaer, Schenectady, Amsterdam, Utica, Syracuse, Rochester, and Buffalo.  The Livingston Avenue Bridge is located on the Hudson Line Section of the Empire Corridor. It’s the only upstate passenger rail crossing of the Hudson River.

The project Environmental Assessment has been completed. The Finding of No Significant Impact by the Federal Railroad Administration is available here.  The Determination of No Significant Effect by NYSDOT is available here.

The current service across the bridge includes twelve Amtrak passenger trains and roughly two to six freight trains (Canadian Pacific Railway and CSX ) daily.  The bridge is a critical link for passenger rail service – as no detour is available without creating substantial delays, upwards of 2.5 hours. 

Schedule

The anticipated project schedule is as follows:

Public Information Meetings and Hearings were held on May 31st (virtual) and June 1st (In Person).  To view the recording of the virtual session click here.
Environmental Assessment is available.
Public Comments were due before 5 p.m. on June 15, 2022.  The Public Comment Period is now closed.
Environmental Determination has been completed.

FRA has issued the Finding of No Significant Impact (FONSI) concluding the NEPA review, (October 31, 2022)
NYSDOT has issued the Determination of No Significant Effect (DONSE) concluding the SEQR review, (November 1, 2022)
Project Final Design is expected to begin in Spring 2024
Construction is expected to be complete in 2028

Photos/Visualizations

The Livingston Avenue Bridge spans the Hudson River connecting Albany to the west and Rensselaer to the east. It is a critical link in the New York State Empire Rail Corridor. The Empire Corridor stretches 463 miles from New York City to Niagara Falls.

The Livingston Avenue Bridge, due to its age and function as a vital crossing of the Hudson River, is one of the most important pieces of the Empire Corridor network that needs upgrading. The bridge is owned by CSX Transportation and is used by approximately 14 Amtrak passenger trains and 6 freight trains per day. The Livingston Avenue Bridge is a swing type bridge that opens when taller ships traveling on the Hudson River need to pass through.

 

View of the South Side of LAB from the Shoreline of the City of Rensselaer

 

View of LAB from the City of Albany's pedestrian overpass spanning I-787 (looking north)

View of the South Side of LAB from Albany's Riverfront Park (Corning Preserve)

 

 

View of the West End of LAB from the Corning Preserve

 

View from the Corning Preserve of the Park Road and Bike Trail going under the LAB

View of the Western End of the LAB from the Albany Side (looking east)

 

Currently, the New York State Department of Transportation is evaluating how to maintain this important Hudson River crossing and bring it up to current railroad industry standards.

  • Owned by CSX Transportation
  • Stone piers constructed in 1866
  • Existing steel superstructure erected in 1901
  • 4 Truss Spans, 1 Truss Swing Span and 4 Girder Spans
  • Eligible for listing on the National Register and State Register of Historic Places
  • Designed in 1901 for trains half the size of modern standards
  • Trains cross one at a time at 15 MPH
  • Unreliable swing span, leads to unpredictable and often of significant delays to both rail and marine traffic
  • Vertical and horizontal clearances are below current rail standards
  • Approximately 14 Amtrak passenger trains and 6 freight train crossings per day
  • Swing span opens about 400 times per year

 

Project Location:

The Empire Corridor High Speed Intercity Passenger Rail

Close up of the projects location

Contact Us:

If you have questions about this project, please contact us:

Scott Cook
50 Wolf Road
Albany, NY 12232
Phone: 518-485-7768
Email: scott.cook@dot.ny.gov
Provide feedback on this project