BRIDGE WASHING SFY 25
Project ID No. 181194 , Contract Number D265663
Description
Power wash bridges to remove accumulated dirt, salt and other debris to help extend the useful life of 110 bridges in Albany, Greene and Rensselaer Counties.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 01/22/2026
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 03/02/2026 | 09/01/2026 | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $1,249,793 | ($254,246) | $995,548 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the CAPITAL DISTRICT region and includes the following:
Counties
ALBANY
ESSEX
GREENE
RENSSELAER
SARATOGA
SCHENECTADY
WARREN
WASHINGTON
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
19th Congressional District (Josh Riley)
20th Congressional District (Paul Tonko)
21th Congressional District (Elise Stefanik)
State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
43th Senatorial District (Jacob Ashby)
44th Senatorial District (James Tedisco)
45th Senatorial District (Daniel G. Stec)
46th Senatorial District (Patricia Fahy)
State Assembly District(s)
102th Assembly District (Chris Tague)
107th Assembly District (Scott Bendett)
108th Assembly District (John T. McDonald III)
109th Assembly District (Gabriella A. Romero)
110th Assembly District (Phil Steck)
111th Assembly District (Angelo Santabarbara)
112th Assembly District (Mary Beth Walsh)
113th Assembly District (Carrie Woerner)
114th Assembly District (Matthew Simpson)
115th Assembly District (Michael Cashman)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: