CULVERT REPAIR/CULVERT REPLACE SFY 27B
Project ID No. 181165 , Contract Number D265884
Description
Repair or replace several large culverts under state routes at various locations in Region One, which includes Albany, Essex, Greene, Rensselaer, Saratoga, Schenectady, Warren and Washington counties.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Winter 2026/2027.
- Construction is expected to begin in Spring 2027.
- Construction is expected to be completed in Fall 2027.
Cost of the Project
The project cost is approximately $2,600,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the CAPITAL DISTRICT region and includes the following:
Counties
SARATOGA
WASHINGTON
Towns
EASTON
MALTA
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
20th Congressional District (Paul Tonko)
21th Congressional District (Elise Stefanik)
State Senatorial District(s)
43th Senatorial District (Jacob Ashby)
44th Senatorial District (James Tedisco)
State Assembly District(s)
107th Assembly District (Scott Bendett)
113th Assembly District (Carrie Woerner)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: