Pavement Resurfacing Setaside SFY 26 2nd Project
Project ID No. 181150 , Contract Number D265716
Description
Resurface pavement at the following sites: Route 9N from Route 74 to existing joint north of Brumbaugh Road, Town of Ticonderoga, Essex County; Route 4 from End Route 29 overlap to End Route 4/32 overlap, Towns of Saratoga and Northumberland, Saratoga County; Route 4 from Ten Broeck Street to Route 32, Town of Stillwater, Saratoga County; Route 50 from Interstate 87 ramp to existing joint/north of Perry Road, Town of Wilton and City of Saratoga Springs, Saratoga County; Route 50 from Start Route 50/67 overlap to existing joint at Front Street, Village of Ballston Spa, Saratoga County; Route 8 from Route 8/9 Loon Lake) to Interstate 87 northbound off ramp, Town of Chestertown, Warren County; Route 9 from Route 254 to Route 149, Town of Queensbury, Warren County; Route 9 from Route 149 to Route 9N South, Town of Lake George, Warren County; Route 22 from Archibald Street to East High Street, Town of Salem, Washington County.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 03/12/2026
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 04/17/2026 | 11/30/2027 | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $15,197,810 | $0 | $15,197,810 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the CAPITAL DISTRICT region and includes the following:
Counties
ESSEX
SARATOGA
WARREN
WASHINGTON
Cities
SARATOGA SPRINGS
Towns
BALLSTON
CHESTER
LAKE GEORGE
MILTON
NORTHUMBERLAND
QUEENSBURY
SALEM
SARATOGA
STILLWATER
TICONDEROGA
WILTON
Villages
SCHUYLERVILLE
STILLWATER
BALLSTON SPA
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
20th Congressional District (Paul Tonko)
21th Congressional District (Elise Stefanik)
State Senatorial District(s)
43th Senatorial District (Jacob Ashby)
44th Senatorial District (James Tedisco)
45th Senatorial District (Daniel G. Stec)
State Assembly District(s)
112th Assembly District (Mary Beth Walsh)
113th Assembly District (Carrie Woerner)
114th Assembly District (Matthew Simpson)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: