Project Details

Pavement Resurfacing Setaside SFY 26 AND GREEN ISLAND

Project ID No. 181149 , Contract Number D265710

Description

Resurface pavement at the following sites: US Route 20 (Western Avenue) from Cornell Avenue to Interstate 87 in the Town of Guilderland; Route 912S from McCarty Avenue to Interstate 787 in the City of Albany; Route 913V (South Mall Expressway) from Mall Platform to Grand Street Overpass in the City of Albany; Albany County. Route 81 from Albany County Line to North Road in the Towns of Rensselaerville, Durham, Greenville; Route 385 from Village of Athens to Murderers Creek in the Town of Athens; Greene County. Route 9 from South of Rt 9/20 split to Route 4. Town of East Greenbush, Rensselaer County.  Project includes NY 915B Green Island Bridge Traffic Reconfiguration and Pedestrian Improvements. 5-way intersection between the traffic signals in Troy and Green Island. Village of Green Island, Albany County.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 02/26/2026

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
03/24/2026 12/17/2027 N/A Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$17,930,554 $0 $17,930,554 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the CAPITAL DISTRICT region and includes the following:

Counties
ALBANY
GREENE
RENSSELAER

Cities
ALBANY
TROY

Towns
ATHENS
DURHAM
EAST GREENBUSH
GREEN ISLAND
GREENVILLE
GUILDERLAND
SCHODACK

Villages
GREEN ISLAND
ATHENS

01 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
19th Congressional District (Josh Riley)
20th Congressional District (Paul Tonko)

State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
43th Senatorial District (Jacob Ashby)
46th Senatorial District (Patricia Fahy)

State Assembly District(s)
102th Assembly District (Chris Tague)
107th Assembly District (Scott Bendett)
108th Assembly District (John T. McDonald III)
109th Assembly District (Gabriella A. Romero)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Scott Cook
50 Wolf Road
Albany, NY 12232
Phone: 518-485-7768
Email: scott.cook@dot.ny.gov
Provide feedback on this project