Project Details

TRAFFIC SIGNALS REBUILD SFY 26

Project ID No. 181117 , Contract Number D265816

Description

Replace traffic signals at the following locations: Route 911H (Altamont Avenue) at Suffolk and Obrien Avenues, in the Town of Rotterdam, Schenectady County; Route 385 (West Bridge Street) at W Main Street, in the Village of Catskill, Greene County; Route 9 (Halfmoon Parkway) at Route 911P (Crescent Vischer Ferry Road/CR 99 Church Hill Road), in the Town of Halfmoon, Saratoga County; Route 146A (Ballston Lake Road) at Ashdown Road, in the Town of Clifton Park, Saratoga County.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 07/16/2026

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
08/07/2026 12/17/2027 11/17/2027 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$1,145,669 $0 $1,145,669 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the CAPITAL DISTRICT region and includes the following:

Counties
GREENE
SARATOGA
SCHENECTADY

Towns
CATSKILL
CLIFTON PARK
HALFMOON
ROTTERDAM

Villages
CATSKILL

01 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
19th Congressional District (Josh Riley)
20th Congressional District (Paul Tonko)

State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
44th Senatorial District (James Tedisco)
46th Senatorial District (Patricia Fahy)

State Assembly District(s)
102th Assembly District (Chris Tague)
111th Assembly District (Angelo Santabarbara)
112th Assembly District (Mary Beth Walsh)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Scott Cook
50 Wolf Road
Albany, NY 12232
Phone: 518-485-7768
Email: scott.cook@dot.ny.gov
Provide feedback on this project