Project Details

TRAFFIC SIGNALS REBUILD SFY 25

Project ID No. 181116 , Contract Number D265398

Description

Replace traffic signals at the following locations: NY Route 5 (State Street) at Washington Avenue, including sidewalks, in the City of Schenectady, Schenectady County; Interstate 87 Northbound & Southbound Exit 19 interchanges in the Town of Queensbury, Warren County; US Route 9 at Route 155 in the Town of Colonie, Albany County; NY Route 32 (Gansevoort Road) at Reservoir Road in the Town of Moreau, Saratoga County; Route 9W at Leeds-Athens Road in the Town of Athens, Greene County. Also, two Variable Message Signs on Interstate 787 and Interstate 87.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 02/20/2025

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
03/25/2025 06/30/2026 05/31/2026 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$2,081,471 $0 $2,081,471 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the CAPITAL DISTRICT region and includes the following:

Counties
ALBANY
GREENE
SARATOGA
SCHENECTADY
WARREN

Cities
SCHENECTADY
WATERVLIET

Towns
ATHENS
COLONIE
MOREAU
QUEENSBURY

Villages
MENANDS

01 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
19th Congressional District (Josh Riley)
20th Congressional District (Paul Tonko)
21th Congressional District (Elise Stefanik)

State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
43th Senatorial District (Jacob Ashby)
44th Senatorial District (James Tedisco)
45th Senatorial District (Daniel G. Stec)

State Assembly District(s)
102th Assembly District (Chris Tague)
108th Assembly District (John T. McDonald III)
110th Assembly District (Phil Steck)
111th Assembly District (Angelo Santabarbara)
113th Assembly District (Carrie Woerner)
114th Assembly District (Matthew Simpson)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Scott Cook
50 Wolf Road
Albany, NY 12232
Phone: 518-485-7768
Email: scott.cook@dot.ny.gov
Provide feedback on this project