BRIDGE PRESERVATION SFY 22
Project ID No. 181082 , Contract Number D264756
Description
Includes preventative maintenance bridge repairs to address specific needs at the following locations: State Route 9N over W BR Bouquet River in the Town of Elizabethtown; Interstate 87 over WEST MILL BROOK, Interstate 87 over WEST MILL BROOK, Interstate 87 SB over Blue Ridge Road, and Interstate 87 NB over Blue Ridge Road in the Town of North Hudson; State Route 74 over Schroon River in Town of Schroon; Interstate 87 SB over Lewis Wahams Road, Interstate 87 NB over Lewis Wahams Road, and US Route 9 over North Branch Bouquet in Town of Lewis; State Route 86 over West Branch Ausable River in Town of Wilmington; State Route 22 over TICONDEROGA CREEK in the Ticonderoga; State Route 28N over BOREAS RIVER in the Town of Minerva; Essex County. Interstate 87 SB over UPPER VALLEY FARM ROAD and Interstate 87 northbound over UPPER VALLEY FARM ROAD, Town of Chester, Warren County. State Route 22 over South Bay, Town of Whitehall, Washington County.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 07/07/2022
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 08/18/2022 | 11/01/2024 | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $11,976,000 | $974,235 | $12,950,235 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the CAPITAL DISTRICT region and includes the following:
Counties
ESSEX
WARREN
WASHINGTON
Towns
CHESTER
ELIZABETHTOWN
LEWIS
MINERVA
NORTH HUDSON
SCHROON
TICONDEROGA
WHITEHALL
WILMINGTON
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
21th Congressional District (Elise Stefanik)
State Senatorial District(s)
45th Senatorial District (Daniel G. Stec)
State Assembly District(s)
114th Assembly District (Matthew Simpson)
115th Assembly District (Michael Cashman)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: