BRIDGE PRESERVATION SFY 21
Project ID No. 181081 , Contract Number D264432
Description
Preventative maintenance bridge repairs to address specific needs at the following locations: Route 23A over East Kill in the Town of Jewett, Greene County; Route 156 over Beaverdam Creek in the Town of Berne, Albany County; Sitterly Road over Interstate 87 in the Town of Clifton Park, Saratoga County; Interstate 87 southbound over the Hudson River in the Town of Moreau, Saratoga County; Interstate 87 northbound over the Hudson River in the Town of Moreau, Saratoga County; Interstate 87 southbound over Route 29 in the City of Saratoga Springs, Saratoga County; Interstate 87 northbound over Route 29 in the City of Saratoga Springs, Saratoga County.
Project Overview
Project Status
- The project has been Completed Project.
- The Bid Opening was on 03/11/2021
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 05/27/2021 | 11/15/2022 | 01/19/2023 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $5,400,781 | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the CAPITAL DISTRICT region and includes the following:
Counties
ALBANY
GREENE
SARATOGA
WARREN
Cities
SARATOGA SPRINGS
Towns
BERNE
CLIFTON PARK
JEWETT
MOREAU
QUEENSBURY
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
19th Congressional District (Josh Riley)
20th Congressional District (Paul Tonko)
21th Congressional District (Elise Stefanik)
State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
44th Senatorial District (James Tedisco)
45th Senatorial District (Daniel G. Stec)
46th Senatorial District (Patricia Fahy)
State Assembly District(s)
102th Assembly District (Chris Tague)
112th Assembly District (Mary Beth Walsh)
113th Assembly District (Carrie Woerner)
114th Assembly District (Matthew Simpson)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: