Project Details

PAVEMENT CORRECTIVE MAINTENANCE SFY21B

Project ID No. 181069 , Contract Number D264406

Description

Pavement corrective maintenance at the following locations: US Route 9 from Dunning Street to Saratoga Springs city limit in the Town of Malta and City of Saratoga Springs and State Route 29 (Spring St) from Bryant Bridge Road to Route 4/32 in the Town of Saratoga; Saratoga County. State Route 8 from Summit Drive to State Route 9N in the Town of Hague; State Route 9L (Ridge Road) from Route 254 (Quaker Road) to Sunnyside Road in the Towns of Queensbury and Lake George; State Route 9L (Ridge Road) from Clements Road to Pilot Knob Road in the Towns of Queensbury and Lake George; State Route 149 (Ann Street) from Washington County Line to US Route 4 in the Town of Kingsbury; Warren County; and State Route 29 (Spring Street) from Bryant Bridge Road to Route 4/32, Town of Saratoga, Saratoga County.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 02/04/2021

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
03/05/2021 12/31/2022 09/20/2022 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$10,941,788 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the CAPITAL DISTRICT region and includes the following:

Counties
SARATOGA
WARREN
WASHINGTON

Cities
SARATOGA SPRINGS

Towns
FORT ANN
HAGUE
MALTA
QUEENSBURY
SARATOGA

Villages
FORT ANN
SCHUYLERVILLE

01 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
20th Congressional District (Paul Tonko)
21th Congressional District (Elise Stefanik)

State Senatorial District(s)
44th Senatorial District (James Tedisco)
45th Senatorial District (Daniel G. Stec)

State Assembly District(s)
113th Assembly District (Carrie Woerner)
114th Assembly District (Matthew Simpson)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Scott Cook
50 Wolf Road
Albany, NY 12232
Phone: 518-485-7768
Email: scott.cook@dot.ny.gov
Provide feedback on this project