PAVEMENT CORRECTIVE MAINTENANCE SFY20A
Project ID No. 181066 , Contract Number D264177
Description
Funding set-aside for pavement maintenance as needed in State Fiscal Year 20/21 (4/1/2020-3/31/2021): New York Route 86 in the Town of North Elba and Village of Lake Placid, Essex County; New York Route 196 in the Village of Hudson Falls and Town of Kingsbury, Washington County; New York Route 9N in the Towns of Lake George and Bolton, Warren County; New York Route 149 in the Town of Queensbury, Warren County; and New York Route 149 in the Village of Granville, Washington County.
Project Overview
Project Status
- The project has been Completed Project.
- The Bid Opening was on 02/13/2020
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 05/04/2020 | 11/15/2021 | 11/09/2021 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $9,531,067 | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the CAPITAL DISTRICT region and includes the following:
Counties
ESSEX
WARREN
WASHINGTON
Towns
BOLTON
GRANVILLE
KINGSBURY
LAKE GEORGE
NORTH ELBA
QUEENSBURY
Villages
GRANVILLE
HUDSON FALLS
LAKE GEORGE
LAKE PLACID
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
21th Congressional District (Elise Stefanik)
State Senatorial District(s)
43th Senatorial District (Jacob Ashby)
45th Senatorial District (Daniel G. Stec)
State Assembly District(s)
113th Assembly District (Carrie Woerner)
114th Assembly District (Matthew Simpson)
115th Assembly District (Michael Cashman)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: