Project ID No. 181039 , Contract Number D263933

Description

Conduct preventative maintenance or repair pavement to improve conditions on State Route 214 in the Town of Hunter, State Route 385 in the Town and Village of Catskill and the Town and Village of Athens, and State Route 23A in the Village of Tannersville; Greene County. And State Route 5 in the Town of Glenville and State Route 7 in the Town of Rotterdam; Schenectady County.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 04/11/2019

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
05/10/2019 07/31/2020 07/31/2020 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$13,187,499 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the CAPITAL DISTRICT region and includes the following:

Counties
GREENE
SARATOGA
SCHENECTADY
ULSTER

Towns
ATHENS
CATSKILL
CHARLTON
GLENVILLE
HUNTER
JEWETT
LEXINGTON
PRATTSVILLE
ROTTERDAM
SHANDAKEN

Villages
TANNERSVILLE
ATHENS
CATSKILL

01 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
19th Congressional District (Josh Riley)
20th Congressional District (Paul Tonko)

State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
44th Senatorial District (James Tedisco)
46th Senatorial District (Patricia Fahy)

State Assembly District(s)
102th Assembly District (Chris Tague)
111th Assembly District (Angelo Santabarbara)
112th Assembly District (Mary Beth Walsh)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Scott Cook
50 Wolf Road
Albany, NY 12232
Phone: 518-485-7768
Email: scott.cook@dot.ny.gov
Provide feedback on this project