ROUTE 146 OVER CHRISLER AVE, BRIDGE REPAIR OR REPLACE, BIN 1038330
Project ID No. 108551
Description
Repair or replace bridge carrying State Route 146 over Chrisler Avenue. Town of Rotterdam, Schenectady County.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Summer 2027.
- Construction is expected to begin in Fall 2027.
- Construction is expected to be completed in Summer 2028.
Cost of the Project
The project cost is approximately $19,000,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the CAPITAL DISTRICT region and includes the following:
Counties
SCHENECTADY
Towns
ROTTERDAM
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
20th Congressional District (Paul Tonko)
State Senatorial District(s)
46th Senatorial District (Patricia Fahy)
State Assembly District(s)
111th Assembly District (Angelo Santabarbara)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: