RT. 9/50 DRAINAGE REPAIR AND PAVEMENT RESURFACING CITY OF SARATOGA SPRINGS, SARATOGA COUNTY
Project ID No. 104367
Description
RT. 9/50 Drainage repair and pavement resurfacing - Beginning of arterial/overlap with route 50 to the end of the arterial. City of Saratoga Springs, Saratoga County.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Winter 2026/2027.
- Construction is expected to begin in Spring 2027.
- Construction is expected to be completed in Winter 2027/2028.
Cost of the Project
The project cost is approximately $2,500,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the CAPITAL DISTRICT region and includes the following:
Counties
SARATOGA
Cities
SARATOGA SPRINGS
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
20th Congressional District (Paul Tonko)
State Senatorial District(s)
44th Senatorial District (James Tedisco)
State Assembly District(s)
113th Assembly District (Carrie Woerner)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: