Project Details

Bridge Where & When

Project ID No. 0BWW22 , Contract Number D264858

Description

This project proposes to provide maintenance or structural repairs to various bridges elements to maintain their reliability and integrity and help assure the continued safety of the traveling public in Nassau and Suffolk counties. Work will be assigned on an as-needed basis to bridges throughout Nassau and Suffolk Counties.  In addition, the following bridges will be included in this project:  1. Loop Parkway Drawbridge over Long Creek in the Town of Hempstead, Nassau County 2. Meadowbrook State Parkway Drawbridge over Sloop Channel in the Town of Hempstead, Nassau County  3. Locust Avenue over NY27 (Sunrise Highway) in the Town of Islip, Suffolk County  4. Hawkins Avenue over Interstate 495 (Long Island Expressway) in the Town of Brookhaven, Suffolk County 5. Ronkonkoma Avenue Bridge Over Interstate 495 (Long Island Expressway) in the Town of Brookhaven, Suffolk County

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 10/06/2022

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
11/02/2022 12/31/2024 10/24/2024 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$4,528,000 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: No

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the LONG ISLAND region and includes the following:

Counties
NASSAU
SUFFOLK

10 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
1st Congressional District (Nick LaLota)
2nd Congressional District (Andrew Garbarino)
3rd Congressional District (Thomas R. Suozzi)
4th Congressional District (Laura Gillen)

State Senatorial District(s)
1st Senatorial District (Anthony H. Palumbo)
2nd Senatorial District (Mario R. Mattera)
3rd Senatorial District (Dean Murray)
4th Senatorial District (Monica R. Martinez)
5th Senatorial District (Steven D. Rhoads)
6th Senatorial District (Siela A. Bynoe)
7th Senatorial District (Jack M. Martins)
8th Senatorial District (Alexis Weik)
9th Senatorial District (Patricia Canzoneri-Fitzpatrick)

State Assembly District(s)
001th Assembly District (Tommy John Schiavoni)
002th Assembly District (Jodi Giglio)
003th Assembly District (Joe DeStefano)
004th Assembly District (Rebecca Kassay)
005th Assembly District (Doug Smith)
006th Assembly District (Phil Ramos)
007th Assembly District (Jarett Gandolfo)
008th Assembly District (Michael J. Fitzpatrick)
009th Assembly District (Michael Durso)
010th Assembly District (Steve Stern)
011th Assembly District (Kwani B. O'Pharrow)
012th Assembly District (Keith P. Brown)
013th Assembly District (Charles D. Lavine)
014th Assembly District (David G. McDonough)
015th Assembly District (Jake Blumencranz)
016th Assembly District (Daniel J. Norber)
017th Assembly District (John K. Mikulin)
018th Assembly District (Noah Burroughs)
019th Assembly District (Edward P. Ra)
020th Assembly District (Ari Brown)
021th Assembly District (Judy Griffin)
022th Assembly District (Michaelle C. Solages)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 10 Regional Public Involvement Coordinator (RPIC)
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov
Provide feedback on this project