Project Details

ADA Compliance

Project ID No. 0ADA25 , Contract Number D265684

Description

This project proposes installing/upgrading of sidewalk curb ramps and installing/repairing of sidewalk segments to meet current Americans with Disabilities Act and Department standards to bring the curb ramps into compliance with the American with Disabilities Act. 1. NY25 (E Jericho Turnpike/ Jericho Turnpike) from Engelke Avenue to Rural Place in the Town of Huntington, Suffolk County. Install/upgrade sidewalk curb ramps. 2. NY25 (Jericho Turnpike) east of Old Indian Head Road to Harned Road in the Town of Smithtown, Suffolk County. Install/repair sidewalk segments. 3. NY111 (Main Street) from Townline Road to NY25A (North Country Road) in the Towns of Islip and Smithtown, Suffolk County. Install/upgrade sidewalk curb ramps. 4. NY25 (Middle Country Road) from Hemlock Lane to Astor Avenue in the Town of Smithtown, Suffolk County. Install/upgrade sidewalk curb ramps. 5. NY25A (Main Street/West Broadway) from west of Van Brunt Manor Road to Washington Street in the Town of Brookhaven, Suffolk County. Install/repair sidewalk segments. 6. NY25 (Middle Country Road) from Wellington Road to Birchwood Park Drive in the Town of Brookhaven, Suffolk County. Install/upgrade sidewalk curb ramps. 7. NY25 (Middle Country Road) from CR21 (Yaphank Middle Island Road) to approximately 170 feet east in the Town of Brookhaven, Suffolk County. Install/repair sidewalk segments. 8. NY25 (W Main Street/E Main Street) from Mill Road to Union Avenue in the Town of Riverhead, Suffolk County. Install/upgrade sidewalk curb ramps. 9. NY25 (Main Road) from east of Circle Drive to west of South Jamesport Avenue in the Town of Riverhead, Suffolk County. Install/repair sidewalk segments. 10. NY25 (Main Street) from Herricks Lane to Bridge Lane in the Town of Southold, Suffolk County. Install/upgrade sidewalk curb ramps. 11. NY25 (Main Road) from Champlin Place to Youngs Road in the Town of Southold, Suffolk County. Install/upgrade sidewalk curb ramps.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 02/05/2026

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
03/12/2026 05/26/2027 04/26/2027 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$2,094,314 $0 $2,094,314 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the LONG ISLAND region and includes the following:

Counties
SUFFOLK

Towns
BROOKHAVEN
HUNTINGTON
ISLIP
RIVERHEAD
SMITHTOWN
SOUTHOLD

Villages
VILLAGE OF THE BRANCH

10 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
1st Congressional District (Nick LaLota)
2nd Congressional District (Andrew Garbarino)

State Senatorial District(s)
1st Senatorial District (Anthony H. Palumbo)
2nd Senatorial District (Mario R. Mattera)
3rd Senatorial District (Dean Murray)
4th Senatorial District (Monica R. Martinez)
8th Senatorial District (Alexis Weik)

State Assembly District(s)
001th Assembly District (Tommy John Schiavoni)
002th Assembly District (Jodi Giglio)
003th Assembly District (Joe DeStefano)
004th Assembly District (Rebecca Kassay)
006th Assembly District (Phil Ramos)
007th Assembly District (Jarett Gandolfo)
008th Assembly District (Michael J. Fitzpatrick)
010th Assembly District (Steve Stern)
012th Assembly District (Keith P. Brown)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 10 Regional Public Involvement Coordinator (RPIC)
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov
Provide feedback on this project