Project Details

Guiderail Rehabilitation

Project ID No. 081079 , Contract Number D265527

Description

This project proposes to repair/replace damaged or non-standard guiderail to meet current engineering standards & add new sections of guiderail to ensure the safety of the traveling public. 1. Meadowbrook State Pkwy n/b at Exit M2 West (Shopping Mall/Zeckendorf Blvd), Town of Hempstead, Nassau County 2. NY25A (Northern Blvd) east of Mineola Ave, Town of North Hempstead, Nassau County 3. Interstate 495 (LIE) e/b west of Exit 48 (Round Swamp Rd), Town of Oyster Bay, Nassau County 4. NY25 (Jericho Tpk) spot locations from Seaman Rd to Robbins Ln, Town of Oyster Bay, Nassau County 5. NY135 (Seaford-Oyster Bay Exp), Town of Oyster Bay, Nassau County a. s/b over NY24 (Hempstead Tpk) guiderail north & south of bridge b. n/b over NY24 (Hempstead Tpk) box beam guiderail north & south of bridge c. s/b Exit 7W ramp to NY24 (Hempstead Tpk) w/b d. n/b spot locations from Exit 9 (Plainview Rd) ramp to north of Haypath Rd e. s/b north of Broadway to end of ramp at Exit 9 (Broadway) f. n/b south of Exit 12E ramp to Northern State Pkwy e/b g. s/b approach at Exit 12E ramp to Northern State Pkwy e/b h. s/b Exit 13E ramp to Interstate 495 (LIE) e/b i. n/b north of Interstate 495 (LIE) j. s/b south of Crossways Park Dr k. n/b Exit 14E ramp to NY25 (Jericho Tpk) e/b 6. NY27 (Sunrise Hwy) e/b at Exit 39 (Hubbards Path), Town of Babylon, Suffolk County 7. Southern State Parkway w/b at Exit 37N (N Belmont Ave), Town of Babylon, Suffolk County 8. LIE North Service Rd w/b at Wicks Rd exit, Town of Islip, Suffolk County

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 07/10/2025

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
08/18/2025 11/27/2026 N/A Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$2,599,159 $5,943 $2,605,102 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the LONG ISLAND region and includes the following:

Counties
NASSAU
SUFFOLK

Towns
BABYLON
HEMPSTEAD
ISLIP
NORTH HEMPSTEAD
OYSTER BAY

Villages
FLOWER HILL

10 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
2nd Congressional District (Andrew Garbarino)
3rd Congressional District (Thomas R. Suozzi)
4th Congressional District (Laura Gillen)

State Senatorial District(s)
4th Senatorial District (Monica R. Martinez)
5th Senatorial District (Steven D. Rhoads)
6th Senatorial District (Siela A. Bynoe)
7th Senatorial District (Jack M. Martins)
8th Senatorial District (Alexis Weik)

State Assembly District(s)
006th Assembly District (Phil Ramos)
009th Assembly District (Michael Durso)
010th Assembly District (Steve Stern)
011th Assembly District (Kwani B. O'Pharrow)
013th Assembly District (Charles D. Lavine)
015th Assembly District (Jake Blumencranz)
016th Assembly District (Daniel J. Norber)
017th Assembly District (John K. Mikulin)
019th Assembly District (Edward P. Ra)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 10 Regional Public Involvement Coordinator (RPIC)
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov
Provide feedback on this project