Project Details

PM Drainage Clean/Repair/Replace

Project ID No. 081058 , Contract Number D265112

Description

This project proposes improvements to the drainage systems at various locations to maintain their reliability and integrity and help assure the continued safety of the traveling public. 1. Clean 50 stormwater quality units in various towns in Nassau & Suffolk County. 2. NY878 (Nassau Expressway) from NY878/Rockaway Turnpike to Bay Boulevard, Town of Hempstead, Nassau. Parking Lot floods near intersection. Redirect surface flow to nearby leaching basins 3. Meadowbrook Parkway from East Meadow Brook to creek north of Babylon Turnpike, Town of Hempstead, Nassau. Clean culverts. 4. Wantagh State Parkway at the Pedestrian Bridge near Beltagh Avenue, Town of Hempstead, Nassau. Clean drainage structures, pipes & install additional drainage structures. 5. Southern Pkwy from Queens/Nassau line to Nassau/Suffolk line, Towns of Hempstead & Oyster Bay, Nassau. Clean, repair or replace drainage structures, pipes & culverts. 6. NY101 (Port Washington Boulevard) from NY25A (Northern Boulevard) to Park Avenue, Town of North Hempstead, Nassau. Install drainage structures with curb boxes at low point. 7. Southern Parkway from the Nassau/Suffolk line to Robert Moses Causeway, Towns of Babylon & Islip, Suffolk. Clean, repair or replace drainage structures, clean culverts. 8. NY454 (Veterans Memorial Highway) at the following locations, Towns of Smithtown & Islip, Suffolk. a. Eastbound from Smithtown Avenue to Artic Avenue. Repair drainage structures. b. Suffolk Avenue/Old Nichols Rd to Connetquot Avenue. Clean, repair as needed all basins & connection pipes. c. Sycamore Avenue to Blydenburgh Road. Clean all basins & connection pipes. d. NY25 (Jericho Turnpike) to NY111 (Wheeler Rd). Clean, repair, replace drainage structures & remove roadside build-up.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 11/09/2023

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
01/16/2024 02/25/2025 N/A Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$4,982,665 ($449,046) $4,533,619 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the LONG ISLAND region and includes the following:

Counties
NASSAU
SUFFOLK

Towns
BABYLON
HEMPSTEAD
ISLIP
NORTH HEMPSTEAD
OYSTER BAY
SMITHTOWN

Villages
FLOWER HILL
HEMPSTEAD
ISLANDIA

10 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
1st Congressional District (Nick LaLota)
2nd Congressional District (Andrew Garbarino)
3rd Congressional District (Thomas R. Suozzi)
4th Congressional District (Laura Gillen)
5th Congressional District (Gregory Meeks)

State Senatorial District(s)
2nd Senatorial District (Mario R. Mattera)
4th Senatorial District (Monica R. Martinez)
5th Senatorial District (Steven D. Rhoads)
6th Senatorial District (Siela A. Bynoe)
7th Senatorial District (Jack M. Martins)
8th Senatorial District (Alexis Weik)
9th Senatorial District (Patricia Canzoneri-Fitzpatrick)
14th Senatorial District (Leroy Comrie)

State Assembly District(s)
005th Assembly District (Doug Smith)
006th Assembly District (Phil Ramos)
007th Assembly District (Jarett Gandolfo)
008th Assembly District (Michael J. Fitzpatrick)
009th Assembly District (Michael Durso)
011th Assembly District (Kwani B. O'Pharrow)
014th Assembly District (David G. McDonough)
016th Assembly District (Daniel J. Norber)
017th Assembly District (John K. Mikulin)
018th Assembly District (Noah Burroughs)
020th Assembly District (Ari Brown)
021th Assembly District (Judy Griffin)
022th Assembly District (Michaelle C. Solages)
033th Assembly District (Clyde Vanel)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 10 Regional Public Involvement Coordinator (RPIC)
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov
Provide feedback on this project