Rustic Rail Replacement
Project ID No. 081055 , Contract Number D265270
Description
This project proposes to repair/replace damaged or non-standard guiderail to meet current engineering standards & add new sections of guiderail to ensure the safety of the traveling public in Nassau & Suffolk Counties.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 09/12/2024
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 11/22/2024 | 10/31/2025 | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $12,656,000 | ($1,814,528) | $10,841,472 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the LONG ISLAND region and includes the following:
Counties
NASSAU
SUFFOLK
Cities
GLEN COVE
Towns
BABYLON
BROOKHAVEN
EAST HAMPTON
HEMPSTEAD
ISLIP
NORTH HEMPSTEAD
OYSTER BAY
SMITHTOWN
Villages
FREEPORT
NORTH HILLS
OLD BROOKVILLE
ROSLYN HARBOR
EAST HAMPTON
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
1st Congressional District (Nick LaLota)
2nd Congressional District (Andrew Garbarino)
3rd Congressional District (Thomas R. Suozzi)
4th Congressional District (Laura Gillen)
State Senatorial District(s)
1st Senatorial District (Anthony H. Palumbo)
2nd Senatorial District (Mario R. Mattera)
3rd Senatorial District (Dean Murray)
4th Senatorial District (Monica R. Martinez)
5th Senatorial District (Steven D. Rhoads)
6th Senatorial District (Siela A. Bynoe)
7th Senatorial District (Jack M. Martins)
9th Senatorial District (Patricia Canzoneri-Fitzpatrick)
State Assembly District(s)
001th Assembly District (Tommy John Schiavoni)
005th Assembly District (Doug Smith)
008th Assembly District (Michael J. Fitzpatrick)
009th Assembly District (Michael Durso)
011th Assembly District (Kwani B. O'Pharrow)
012th Assembly District (Keith P. Brown)
013th Assembly District (Charles D. Lavine)
014th Assembly District (David G. McDonough)
015th Assembly District (Jake Blumencranz)
016th Assembly District (Daniel J. Norber)
018th Assembly District (Noah Burroughs)
020th Assembly District (Ari Brown)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov