Rustic Rail Replacement
Project ID No. 081043 , Contract Number D265040
Description
This project proposes to replace existing rustic guiderail with new guiderail that meets current engineering standards. In addition, new sections of guiderail will be added, if warranted, to ensure the safety of the traveling public 1. NY105 (Jerusalem Avenue) from Holiday Park Drive to Daffodil Lane in the Town of Hempstead, Nassau County 2. NY25A from the Nassau/Suffolk line to 0.09 miles west in the Town of Oyster Bay, Nassau County 3. NY25A from the Nassau/Suffolk line to 0.7 miles east in the Town of Huntington, Suffolk County 4. NY25A (St. Johnland Road) at NY25/NY25A Intersection in the Town of Smithtown, Suffolk County 5. NY25 (West Main Street) at the NY25/NY25A Intersection in the Town of Smithtown, Suffolk County 6. Southern State Parkway from Heckscher State Park to NY109 (Farmingdale Road) approach to the bridges and ramps in the Towns of Babylon and Islip, Suffolk County 7. Robert Moses Causeway from 0.7 miles south of NY27A (Montauk Highway) to Robert Moses Causeway Southern Terminus in the Town of Islip, Suffolk County
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 03/14/2024
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 04/25/2024 | 08/15/2025 | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $6,972,763 | $830,863 | $7,803,626 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the LONG ISLAND region and includes the following:
Counties
NASSAU
SUFFOLK
Towns
BABYLON
HEMPSTEAD
HUNTINGTON
ISLIP
OYSTER BAY
SMITHTOWN
Villages
LAUREL HOLLOW
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
1st Congressional District (Nick LaLota)
2nd Congressional District (Andrew Garbarino)
3rd Congressional District (Thomas R. Suozzi)
4th Congressional District (Laura Gillen)
State Senatorial District(s)
2nd Senatorial District (Mario R. Mattera)
4th Senatorial District (Monica R. Martinez)
5th Senatorial District (Steven D. Rhoads)
7th Senatorial District (Jack M. Martins)
8th Senatorial District (Alexis Weik)
State Assembly District(s)
006th Assembly District (Phil Ramos)
007th Assembly District (Jarett Gandolfo)
008th Assembly District (Michael J. Fitzpatrick)
009th Assembly District (Michael Durso)
010th Assembly District (Steve Stern)
011th Assembly District (Kwani B. O'Pharrow)
012th Assembly District (Keith P. Brown)
014th Assembly District (David G. McDonough)
015th Assembly District (Jake Blumencranz)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.