Drainage Enhancements
Project ID No. 081038 , Contract Number D265214
Description
This project proposes to reduce the incidents and magnitude of coastal storm related flooding at: 1. Meadowbrook State Parkway under Merrick Road in the Town of Hempstead, Nassau County. The work includes hydraulically separating the Meadowbrook Parkway low point located under the Merrick Road bridge (approximately 1000 feet roadway length) with an earth embankment, check valves, rerouting of drainage lines, and installing a Pump Station to drain the isolated area low point. Additional work includes installing underground drains to dewater the permanently soggy grass shoulder. 2. Wantagh State Parkway under Bay Parkway in the Town of Hempstead, Nassau County. The work involves hydraulically separating the Wantagh Parkway low point located under the Bay Parkway bridge (approximately 1000 feet roadway length) with check valves, rerouting of drainage lines, and installing a Pump Station to drain the isolated area low point. Additional work includes installing underground drains to dewater the permanently soggy grass shoulder and installing a coastline structure to protect outfall pipes that are repeatedly damaged from coastal storms.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 09/26/2024
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 10/29/2024 | 02/27/2026 | 06/01/2026 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $9,495,561 | $208,026 | $9,703,587 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the LONG ISLAND region and includes the following:
Counties
NASSAU
Towns
HEMPSTEAD
Villages
FREEPORT
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
4th Congressional District (Laura Gillen)
State Senatorial District(s)
5th Senatorial District (Steven D. Rhoads)
6th Senatorial District (Siela A. Bynoe)
State Assembly District(s)
014th Assembly District (David G. McDonough)
018th Assembly District (Noah Burroughs)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov