Crack Sealing Contract

Project ID No. 080967 , Contract Number D263419

Description

This proposed project will apply a preventative maintenance treatment to seal cracks in the pavement. This work helps keep the highway system in a state of good repair. The locations are as follows: NY27 from Stephen Hands Path to NY114 (Sag Harbor Turnpike), Town of East Hampton, Suffolk County; 907E (Bethpage Parkway) from Southern State Parkway to Traffic Circle, Town of Oyster Bay, Nassau County; 900P (Jamaica Avenue) from 225th Street to NY25, Town of Hempstead, Nassau County; NY25 from 900P (Jamaica Avenue) to Glen Cove Road, Towns of Hempstead and North Hempstead, Nassau County; NY25 from NY347 to CR83 (North Ocean Avenue), Towns of Smithtown and Brookhaven, Suffolk County.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 04/20/2017

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
05/25/2017 08/31/2018 11/14/2017 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$2,371,855 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the LONG ISLAND region and includes the following:

Counties
NASSAU
QUEENS
SUFFOLK

Cities
NEW YORK

Towns
BROOKHAVEN
EAST HAMPTON
HEMPSTEAD
NORTH HEMPSTEAD
OYSTER BAY
SMITHTOWN

Villages
FLORAL PARK
LAKE GROVE
MINEOLA
NEW HYDE PARK
OLD WESTBURY
BELLEROSE
EAST HAMPTON

10 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
1st Congressional District (Nick LaLota)
2nd Congressional District (Andrew Garbarino)
3rd Congressional District (Thomas R. Suozzi)
4th Congressional District (Laura Gillen)

State Senatorial District(s)
1st Senatorial District (Anthony H. Palumbo)
2nd Senatorial District (Mario R. Mattera)
3rd Senatorial District (Dean Murray)
5th Senatorial District (Steven D. Rhoads)
6th Senatorial District (Siela A. Bynoe)
7th Senatorial District (Jack M. Martins)
8th Senatorial District (Alexis Weik)
9th Senatorial District (Patricia Canzoneri-Fitzpatrick)

State Assembly District(s)
001th Assembly District (Tommy John Schiavoni)
004th Assembly District (Rebecca Kassay)
005th Assembly District (Doug Smith)
008th Assembly District (Michael J. Fitzpatrick)
015th Assembly District (Jake Blumencranz)
016th Assembly District (Daniel J. Norber)
017th Assembly District (John K. Mikulin)
019th Assembly District (Edward P. Ra)
022th Assembly District (Michaelle C. Solages)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 10 Regional Public Involvement Coordinator (RPIC)
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov
Provide feedback on this project