Crack Sealing Contract
Project ID No. 080951 , Contract Number D263074
Description
This proposed project will apply a preventative maintenance treatment to seal cracks in the pavement along Meadowbrook Parkway (NY908E) from south of Merrick Road to Southern Parkway, Montauk Highway (NY27A) from Howard Avenue to Wellwood Ave, Front Street (NY102) from William Street to Hempstead Turnpike (NY24) in East Meadow and the Long Island Expressway (I495) from Sunnyside Blvd. (Exit 46) to east of Round Swamp Road (Exit 48). Project locations are in the towns of Hempstead, Babylon, Oyster Bay and Huntington, Nassau and Suffolk Counties. This work helps keep the highway system in a state of good repair.
Project Overview
Project Status
- The project has been Completed Project.
- The Bid Opening was on 03/03/2016
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 04/27/2016 | 12/30/2016 | 08/16/2017 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $1,181,069 | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: No
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the LONG ISLAND region and includes the following:
Counties
NASSAU
SUFFOLK
Towns
BABYLON
HEMPSTEAD
HUNTINGTON
OYSTER BAY
Villages
FREEPORT
HEMPSTEAD
LINDENHURST
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
1st Congressional District (Nick LaLota)
2nd Congressional District (Andrew Garbarino)
3rd Congressional District (Thomas R. Suozzi)
4th Congressional District (Laura Gillen)
State Senatorial District(s)
2nd Senatorial District (Mario R. Mattera)
5th Senatorial District (Steven D. Rhoads)
6th Senatorial District (Siela A. Bynoe)
7th Senatorial District (Jack M. Martins)
8th Senatorial District (Alexis Weik)
State Assembly District(s)
010th Assembly District (Steve Stern)
011th Assembly District (Kwani B. O'Pharrow)
014th Assembly District (David G. McDonough)
017th Assembly District (John K. Mikulin)
018th Assembly District (Noah Burroughs)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.