Bridge Repair Contract
Project ID No. 080921 , Contract Number D263109
Description
This project proposes to repair bridges that carry: Southern Parkway over NY135 (Seaford Oyster Bay Expressway), Brook Avenue over NY27 (Sunrise Highway), Lindbergh Blvd. over Meadowbrook Parkway, two spans that carry NY25 (Jericho Turnpike) over NY135 (Seaford Oyster Bay Expressway), and NY231(Deer Park Avenue) over NY27 (Sunrise Highway). Bridges are in the Towns of Oyster Bay, Hempstead, Babylon and Islip in Nassau and Suffolk Counties. Project will help maintain bridge reliability and integrity to assure the continued safety of the traveling public. The work may include all or some of the following: bearing replacement, pier concrete repairs, substructure repair, joint replacement, deck overlay and wearing surface replacement. This type of corrective maintenance helps extend the life of the bridges.
Project Overview
Project Status
- The project has been Completed Project.
- The Bid Opening was on 04/21/2016
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 05/23/2016 | 11/30/2017 | 12/26/2018 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $13,476,800 | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the LONG ISLAND region and includes the following:
Counties
NASSAU
SUFFOLK
Towns
BABYLON
HEMPSTEAD
ISLIP
OYSTER BAY
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
2nd Congressional District (Andrew Garbarino)
3rd Congressional District (Thomas R. Suozzi)
4th Congressional District (Laura Gillen)
State Senatorial District(s)
4th Senatorial District (Monica R. Martinez)
5th Senatorial District (Steven D. Rhoads)
6th Senatorial District (Siela A. Bynoe)
7th Senatorial District (Jack M. Martins)
State Assembly District(s)
006th Assembly District (Phil Ramos)
007th Assembly District (Jarett Gandolfo)
009th Assembly District (Michael Durso)
013th Assembly District (Charles D. Lavine)
015th Assembly District (Jake Blumencranz)
019th Assembly District (Edward P. Ra)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov