Safety Improvements
Project ID No. 080823 , Contract Number D262308
Description
This project proposes to extend acceleration lanes to help improve motorist safety and meet current design standards at the following locations: Town of Hempstead, Nassau County: Meadowbrook State Parkway at Zeckendorf Blvd (Southbound Acceleration Lane), Southern State Parkway at Eagle Avenue (Westbound Acceleration Lane). Town of North Hempstead, Nassau County: Northern State Parkway at Willis Avenue (Westbound Acceleration Lane). Town of Oyster Bay, Nassau County: Northern State Parkway at NY 135 (Seaford Oyster Bay Expressway)(Westbound Acceleration Lane), Northern State Parkway at South Oyster Bay Road (Eastbound and Westbound Acceleration Lane). Town of Islip, Suffolk County: Sagtikos State Parkway at Pine Aire Drive (Southbound Acceleration Lane), Robert Moses Causeway at NY 27 (Sunrise Highway) North Service Road (Northbound Acceleration Lane), Robert Moses Causeway at NY 27 (Sunrise Highway) South Service Road (Southbound Acceleration Lane), Robert Moses Causeway at NY 27A (Northbound and Southbound Acceleration Lane). Town of Smithtown, Suffolk County: Sagtikos State Parkway at NY 454 (Veterans Memorial Highway) (Southbound Acceleration Lane), Sagtikos State Parkway at Northern State Parkway (Southbound Acceleration Lane), Sagtikos State Parkway at I495 North Service Road (Northbound Acceleration Lane), and Sagtikos State Parkway at Vanderbilt Motor Parkway (Northbound Acceleration Lane).
Project Overview
Project Status
- The project has been Completed Project.
- The Bid Opening was on 05/16/2013
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 06/26/2013 | 12/31/2014 | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $4,887,713 | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the LONG ISLAND region and includes the following:
Counties
NASSAU
SUFFOLK
Towns
HEMPSTEAD
ISLIP
NORTH HEMPSTEAD
OYSTER BAY
SMITHTOWN
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
1st Congressional District (Nick LaLota)
2nd Congressional District (Andrew Garbarino)
3rd Congressional District (Thomas R. Suozzi)
4th Congressional District (Laura Gillen)
State Senatorial District(s)
2nd Senatorial District (Mario R. Mattera)
4th Senatorial District (Monica R. Martinez)
5th Senatorial District (Steven D. Rhoads)
6th Senatorial District (Siela A. Bynoe)
7th Senatorial District (Jack M. Martins)
8th Senatorial District (Alexis Weik)
State Assembly District(s)
008th Assembly District (Michael J. Fitzpatrick)
009th Assembly District (Michael Durso)
012th Assembly District (Keith P. Brown)
013th Assembly District (Charles D. Lavine)
015th Assembly District (Jake Blumencranz)
016th Assembly District (Daniel J. Norber)
018th Assembly District (Noah Burroughs)
019th Assembly District (Edward P. Ra)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov