Project Details

Jones Beach Shared Use Path

Project ID No. 076099 , Contract Number D263539

Description

The proposed project plans to construct a Shared Use Path that will connect to the Ocean Parkway Coastal Greenway Shared Use Path at its existing terminus/bike parking facility which is adjacent to the East Bath House. The proposed path route will extend from the East Bath House westerly along the existing boardwalks and promenades that run adjacent to the Main Mall and beach parking fileds. New off road segments are planned to connect between the beaches ultimately terminating at the West End 2 beach. A loop segment connecting the Short Beach Marina area is also planned. Additionally a short segment of the route will run along the existing boardwalk to connect to Field 6 just east of the East Bath House. Town of Hempstead, Nassau County.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 09/07/2017

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
10/05/2017 06/28/2019 04/08/2019 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$3,539,426 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: No

Local: Yes

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the LONG ISLAND region and includes the following:

Counties
NASSAU

Towns
HEMPSTEAD

10 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
4th Congressional District (Laura Gillen)

State Senatorial District(s)
5th Senatorial District (Steven D. Rhoads)

State Assembly District(s)
014th Assembly District (David G. McDonough)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 10 Regional Public Involvement Coordinator (RPIC)
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov