Project Details

NSP Asphalt Pavement Resurfacing Exit 33 WSP to New York Ave

Project ID No. 051660 , Contract Number D265534

Description

This project proposes to restore the pavement riding surface on the Northern State Parkway between Exit 33 (Wantagh State Parkway) and New York Avenue in the Towns of North Hempstead, Oyster Bay and Huntington, Nassau and Suffolk Counties to a smooth and distress free condition by milling and resurfacing the existing pavement. All proposed pavement work is expected to increase safety and provide a smooth riding surface for vehicular travel for the next 10 to 12 years.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 07/24/2025

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
08/21/2025 08/14/2026 N/A Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$18,542,595 ($2,950,910) $15,591,685 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the LONG ISLAND region and includes the following:

Counties
NASSAU
SUFFOLK

Towns
HUNTINGTON
NORTH HEMPSTEAD
OYSTER BAY

Villages
WESTBURY

10 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
1st Congressional District (Nick LaLota)
3rd Congressional District (Thomas R. Suozzi)

State Senatorial District(s)
2nd Senatorial District (Mario R. Mattera)
5th Senatorial District (Steven D. Rhoads)
6th Senatorial District (Siela A. Bynoe)
7th Senatorial District (Jack M. Martins)

State Assembly District(s)
010th Assembly District (Steve Stern)
013th Assembly District (Charles D. Lavine)
015th Assembly District (Jake Blumencranz)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 10 Regional Public Involvement Coordinator (RPIC)
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov
Provide feedback on this project