Project Details

Roslyn Viaduct Appurtenances

Project ID No. 032804 , Contract Number D261853

Description

This project proposes to help improve safety and mobility by widening and resurfacing 1.5 miles of the existing pavement; construct retaining walls, sidewalks and a drainage system; and add new lighting and new signs on the Roslyn Viaduct in the Incorporated Village of Roslyn, Villages of East Hills and Flower Hill, Nassau County

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 04/05/2012

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
05/16/2012 09/30/2013 04/16/2015 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$14,414,414 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: No

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the LONG ISLAND region and includes the following:

Counties
NASSAU

Towns
NORTH HEMPSTEAD

Villages
FLOWER HILL
ROSLYN
EAST HILLS

10 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
3rd Congressional District (Thomas R. Suozzi)

State Senatorial District(s)
7th Senatorial District (Jack M. Martins)

State Assembly District(s)
013th Assembly District (Charles D. Lavine)
016th Assembly District (Daniel J. Norber)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 10 Regional Public Involvement Coordinator (RPIC)
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov
Provide feedback on this project