This project proposes to repair bridges that carry: Half Hollow Rd over the LIE (I495), Washington Ave over the LIE (I495), Ronkonkoma Ave over the LIE (I495), Hawkins Ave over the LIE (I495), the LIE (I495) over Edwards Ave, the LIE (I495) over NY112 (Medford Ave), the LIE (I495) over Sills Rd and Yaphank Ave over the LIE (I495). Bridges are in the Towns of Brookhaven, Huntington & Islip in Suffolk County. Project will help maintain bridge reliability and integrity to assure the continued safety of the traveling public. The work may include all or some of the following: the removal and replacement of existing steel bearings with elastomeric bridge bearings, the reconstruction of bridge bearing pedestals and anchor bolts, repairs to concrete pier cap beams, removal and replacement of deck joint systems, and reconstruction of deck slabs at deck joint regions, and miscellaneous concrete substructure patch repairs. Some bridges will have replacement of their asphalt wearing surface overlay, after milling to remove the existing, installation of a waterproof membrane, and paving of the new asphalt wearing course overlay. This type of corrective maintenance helps extend the life of the bridges.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 05/21/2015

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
07/07/2015 06/30/2017 10/08/2018 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$18,418,418 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: Yes

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the LONG ISLAND region and includes the following:

Counties
SUFFOLK

Towns
BROOKHAVEN
HUNTINGTON
ISLIP

10 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
1st Congressional District (Nick LaLota)
2nd Congressional District (Andrew Garbarino)

State Senatorial District(s)
2nd Senatorial District (Mario R. Mattera)
3rd Senatorial District (Dean Murray)
4th Senatorial District (Monica R. Martinez)

State Assembly District(s)
002th Assembly District (Jodi Giglio)
003th Assembly District (Joe DeStefano)
005th Assembly District (Doug Smith)
006th Assembly District (Phil Ramos)
010th Assembly District (Steve Stern)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 10 Regional Public Involvement Coordinator (RPIC)
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6929
Email: r10-rpic@dot.ny.gov
Provide feedback on this project